Riverside High School

buildings

Institutional

USA

South Carolina Division

The usual demands of building a school — a tight budget and strict schedule — weren’t the only challenges of the Riverside High School project. The new school also needed to achieve LEED certification — one of the first in the country. Tindall’s precast concrete wall panel system, energy efficiency, low maintenance, and environmental benefits did more than add crucial points toward attaining LEED certification; it ensured significant savings on energy costs for the future.

Tindall Corporation Education Precast Concrete Riverside High School Front Entrance Greer South Carolina

Owner

Greenville County Schools

Architect

BRPH Architects-Engineers, Inc. Professional Engineering Associates

Contractor

M.B. Kahn Construction Co., Inc.

Location

Greer, SC

Taking the “LEED” for Green Schools.

This two-story, 250,000-square-foot high school was constructed in just eight months — four months faster than scheduled. This was due to simultaneous foundation and manufacturing work, the erection speed of precast concrete, and on-time delivery of materials.

Despite the speed of construction, no detail was overlooked. The exterior features sandblasted precast concrete and inlaid brick that echoes the look of traditional schools, all while providing superior quality and low maintenance. The internal structure features columns, beams, and solid precast wall panels, while the exterior walls are composed of insulated precast concrete wall panels. These components work together to support the floor and roof construction of double tees and solid slabs. Additionally, Tindall created unique trapezoid classrooms with windows on two sides, ensuring more natural light, and the team utilized long free spans to provide an open, flexible interior space.

Tindall Corporation Education Precast Concrete Riverside High School Cafeteria Greer South Carolina
Tindall Corporation Education Precast Concrete Riverside High School Courtyard Greer South Carolina
Tindall Corporation Education Precast Concrete Riverside High School Aerial Roof Greer South Carolina

More Project Information

Specifications
  • Total precast concrete superstructure
  • 2-story, 250,000-sq.-ft. high school
  • LEED certified
  • 1,688 individual precast pieces
  • Insulated and solid precast wall panels
Finishes
  • Sandblasted concrete
  • Inlaid brick
Components
  • Insulated precast wall panels
  • Columns
  • Beams
  • Solid precast wall panels
  • Double tees
  • Solid slabs

“Riverside High School was a tremendous undertaking… The school’s precast concrete structural system was a benefit in many ways to the successful completion of the high school… The fast track schedule of precast was the most contributing factor to meeting the completion schedule of Riverside High School.”

KEITH BURBAN | SENIOR PROJECT MANAGER | INSTITUTIONAL RESOURCES (INRE)

Get the latest Tindall news. Join our mailing list.